Education: |
| High
School Diploma, Westmoreland High School - Westmoreland, Tennessee |
|
Experience: |
| 3/98 -
Present: Superintendent of McDorman Construction |
Current
Projects:
Premier Office Building
Owner: McDorman Holdings
$4,000,000
Hart Street Professional Office Building
Owner: Hart Street Professional Offices
$5,000,000
Walton Oaks Townhomes
Owner: Turkey Creek Development
$13,000,000
|
| Completed
Commercial Projects: |
Vanguard Bank Operations Bank Remodel
Owner: Vanguard Bank
$590,000
Completed: May 2007
Dr Sharon Chen Dental Office
Owner: Dr. Chen
$779,000
Completed: January, 2007
West Beach Amenities Building
Owner: The St Joe Company
$1,158,000
Completed: December, 2006
Palacio Grande Apartments
Owner: Santa Rosa Property Holdings
$12,000,000
Completed: August, 2005
Courtyard Plaza at Bluewater Bay
Owner: Courtyard Plaza Association
$5,000,000
Completed: January, 2003
Student Services/Student Union Phase I, Decatur, MS
Owner: East Central Community College
$2,100,000
Completed: June, 1999
Erma Lee Barber Hall, Decatur, MS
Owner: East Central Community College
$2,900,000
Completed: August, 1999
|
10/95 - 2/98: Superintendent, Carothers Construction, Inc. |
Projects:
Palm Court Yacht Club, Ft. Walton Beach, Florida
Owner: Island Capital Venture, Inc.
Size: 70,000 SF $7,100,000 Seven story condominium on Okaloosa Island
NTP - August 1997
Repairs to Hospital Surgical and Obstetrical Suites - Eglin AFB, Florida
Owner: Corp of Engineers
Size: $7,000,000 Three story renovation in 100% occupied and fully operational
hospital facility
NTP - December 5, 1995 |
1994 - 10/95: Project Manager/Quality Control, Eaton Contracting Co., Inc., San
Antonio, Texas |
Projects:
New Red Horse Structural/Utility Facility,
Kelly AFB
Owner: Corp of Engineers
Size: Over 20,000 SF $2,000,000
New construction of administrative and training areas. Project included electrical,
mechanical, carpentry, welding shops, and a complete classroom training facility. |
|
1983 - 1994: Project Manager/Superintendent, Universal City Construction,TX |
Projects:
New Commissary, Fort Sam Houston
Size: 105,000 SF $11,000,000
Design/build project with concrete pan slab on drilled pier foundation. Exterior consisted
of load-bearing block walls, interior had structural steel columns and steel joists.
Contract included 370,000 SF asphalt parking lot, lawn sprinklers and an interior
fire-control system.
Bachelors Enlisted Quarters, Lackland AFB
Owner: Corp of Engineers
Size: 160,000 SF $11,000,000
The project consisted of four 3-story buildings and two administrative buildings totaling
160,000 SF. The exterior was load-bearing block walls with a structural steel frame and
exterior walkways on each floor, interior consisted of steel joists and metal decks with
lightweight concrete. Included site utilities, a dual temperature piping system tied
into existing plant, and a 100,00 SF asphalt parking lot.
Building 385, Kelly AFB
Owner: Corp of Engineers
Demolition and rebuilding mechanical and electrical systems in the hanger, new mechanical
piping systems, fire detection and protection systems, asbestos removal, new plenums and
exhaust tower.
Constructed 34 outdoor kennels, Lackland AFB
Size: $112,500
Additions to Buildings 1730 and 3030, Kelly AFB
Size: $500,000
3-story addition including an elevator.
Addition to Building 803, Brooks AFB
Size: $195,000
Building 2000, ESC Headquarters, Kelly AFB
Size: $1,250,000
Remodeled the main corridors of a 3-story building and modified computer cable tram.
Addition to and remodel of existing security police monitoring building outside of
ESC Headquarters. Daily escorts were required full-time inside of building.
Building 1610, Hanger Remodel, Base Operations Building, Kelly AFB
Sized: $500,000
Remodeled interior of operations offices. Included new AHUs, ductwork, and upgrade to
electrical panels and wiring.
S.A. Parks and Recreation, Millers Pond Community Center
Size: $750,000
Consisted of a gymnasium, volleyball courts, arts and crafts areas, administrative
offices, site utilities, and 3000 SF asphalt parking lot.
Floresville Elementary School Additions
Size: $500,000
New classrooms, restrooms, and teacher areas.
Kerville Apartment Complex
Foundation, wood framing, mechanical and electrical quality control.
Temporary Lodging Facilities, Lackland AFB
Size: 80,000 SF $4,000,000
The project consisted of four 6-story and on 2-story lodging complexes and laundry
facility. Exterior consisted of load-bearing metal stud walls with plaster
facade,interior units were drywall and metal stud framed. Included site utilities
and a 60,000 SF asphalt parking lot.
Henry B. Gonzalez Elementary School
Size: $202,000
Re-roof and renovations.
St. John's Church, New Braunfels
Size: $1,000,000
Addition and remodel, included upgrading the mechanical and electrical systems, foundation
framing and finish out. |
1979 - 1983: Electrical Apprenticeship and Journeyman
Electrician |
| Miscellaneous
jobs in Tennessee, Florida, and Alaska |
|
Skills: |
| Project
Management, Project Supervision, Quality Control, Carpentry Work, Heavy Equipment
Operator, Layout, Grades, Welding, Concrete Forming |
|
|